Back to site|

Resource & Shop Floor Dashboard

Velocity Monitor

Active projects by stage. Alerts when velocity drops below 40%.

Engineering0
  • Auto Connector Overmold

    Tier1 Auto

    0%
  • Prototype LSR Valve Gate

    MedTech Inc.

    0%
Machining0
  • LSR Medical Cavity Set

    MedTech Inc.

    0%
  • Aerospace Seal Tool

    AeroDyn

    0%
  • Multi-Cavity Thermoplastic

    Tier1 Auto

    0%
Sampling0
  • Consumer Electronics Housing

    TechGear

    0%
QC0
  • Oil & Gas Seal (56")

    EnergyCo

    0%

Machine Uptime & Health

Availability and predictive maintenance (tool life remaining).

Predictive maintenance alerts

  • Bridge Mill A:Schedule tool inspection(28% life remaining)
  • Sinker EDM-1:Replace tool soon(8% life remaining)

Bridge Mill A

CNC Milling (Large)

Capacity0%
Tool life remaining0%
Uptime0%

5-Axis Center B

5-Axis Machining

Capacity0%
Tool life remaining0%
Uptime0%

Sinker EDM-1

EDM Operations

Capacity0%
Tool life remaining0%
Uptime0%

Sinker EDM-2

EDM Operations

Capacity0%
Tool life remaining0%
Uptime0%

Lathe Cell A

Precision Turning

Capacity0%
Tool life remaining0%
Uptime0%

Surface Grinder

Surface Grinding

Capacity0%
Tool life remaining0%
Uptime0%

Resource Allocation Planner

Drag projects to machines to assign. Reallocate based on real-time capacity and priority.

Unassigned

Oil & Gas Seal (56")

QC · low

Prototype LSR Valve Gate

Engineering · high

Multi-Cavity Thermoplastic

Machining · medium

Bridge Mill A

92%

LSR Medical Cavity Set

Machining · high

5-Axis Center B

65%

Auto Connector Overmold

Engineering · medium

Sinker EDM-1

95%

Aerospace Seal Tool

Machining · high

Sinker EDM-2

40%

Drop projects here

Lathe Cell A

38%

Drop projects here

Surface Grinder

78%

Consumer Electronics Housing

Sampling · medium

Quality & Documentation

Dimensional data reporting and ISO-required documentation. Sign-off in minutes.

DocumentTypeStatusUpdated
Dimensional Report – Cavity 1-12
DimensionalsignedFeb 1, 2026
ISO 9001:2015 Sign-Off
ISOsignedFeb 2, 2026
Material Certification – P20
CertificationpendingFeb 2, 2026
Dimensional Report – 1000 Cavity Tool
DimensionalpendingFeb 2, 2026

Internal use only. Data refreshes periodically. For questions contact your system administrator.